Wednesday, July 11, 2007
Seeing Some Progress
Since my last bathroom update, we have completed the following:
* Replaced the portion of the floor under the tub with plywood.
* Patched up the holes left by the shower with beadboard.
* Added beadboard to the area to the left of the tub and over the door where there was no beadboard.
* Put up crown moulding (Gary is almost finished with the moulding, and then he'll put up the rest of the trim in the room).
My job is to continue getting the walls ready for painting, in other words, caulk. Then of course, it is always my job to paint, which I am happy to do since I get to choose the paint colors. My plan is to do a wide stripe around the room. I was thinking about a dark beige with a red stripe, but I'm still trying to decide. I have leftover red paint from the brick wall in the kitchen, so I'm trying to use paint that I have as we have a lot of paint we have purchased but unused.
In another area of the house...
Speaking of paint, I had purchased a gallon of paint called "Wooden Cabin" for the bathroom but didn't like it for the bathroom, so I decided to paint the bottom portion of the stairway with this color. I think it turned out nice... Take a look at the pictures. I'm trying to decide on a color for the top part of the stairway wall/landing area. Any ideas???
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment