- Upstairs Bathroom
- Master Bedroom
- Walk-in Closet
- Guest Room
Still in progress: Kitchen (sigh...)
Rooms to Complete (besides the kitchen, which WILL, I repeat, WILL be complete before I go back to work):
- Parlor (Decorative painting technique with multiple beiges)
- Dining Room (Color wash over current color... the paint color just looks too flat to me)
- Stairway and Landing (Paint... probably a neutral beige color... definitely NO decorative painting technique)
- Downstairs Bathroom (Caulk cracks in beadboard, paint walls, replace light fixture, and install new flooring, and, oh yeah, paint ceiling)
- Utility Room (paint... no big hurry on this one)
OK, so now I know how I'll be spending my Labor Day weekend, Thanksgiving Break, and Christmas Break, and most likely, every weekend in between.
I REALLY need a vacation, no I mean a real one... away from this house! (I'm still smiling, though...)
No comments:
Post a Comment